Site selection shapes a data center’s cost, schedule and risk more than any decision that follows. We help owners, investors and developers choose land that power, water, fiber and the community can all support.
What it coversSite selection, feasibility, due diligence, utilities, water, natural gas, fiber, development constraints and community strategy support.
Operators, investors, developers, and A/E and EPC firms
When to engage
Before you shortlist, and always before you sign a purchase agreement
What you leave with
A ranked shortlist, a diligence record and a path to entitlement
How an engagement runs
From site search to shovel‑ready
We protect your interests at every step, from the first market screen to the design handoff.
Phase 01
Discovery
Every good site search starts with a clear brief. We pin down capacity, phasing, latency, budget and risk tolerance with you, so every site that follows is judged against the same yardstick.
Deliverable
Site criteria brief
Phase 02
Assessment
We score markets and parcels against the brief, from power availability and fiber to tax incentives, and cut the long list down to the few sites worth investigating in depth.
Deliverable
Ranked site shortlist
Phase 03
Analysis
We investigate the shortlist on the ground: utility capacity and timelines, zoning, environmental, geotechnical, title and community sentiment. You see each risk and its cost before you commit capital.
Deliverable
Due diligence report
Phase 04
Implementation
We support negotiations, utility agreements and entitlement filings, and stay on your side of the table until the site is under control and the path to permits is clear.
Deliverable
Entitlement roadmap
Phase 05
Execution
We pass a de-risked site and its full record to your design team, so engineering starts from verified facts instead of assumptions.
Deliverable
Design-ready site package
How we work
The cheapest time to find a problem with a site is before you own it.
Evidence over optimism
Every claim about power, water and fiber is checked at the source.
One yardstick
Each site is scored against the same written criteria.
Your side of the table
Our advice is owner-side, from the first screen to closing.
What we cover
Six questions every site has to answer.
We work through each one on your side of the table and put the answers in writing before you commit.
01
Site selection
Market and parcel screening against power, latency, land, tax and incentive criteria, ranked so you compare every site on the same terms.
02
Feasibility and due diligence
Zoning, environmental, geotechnical, flood, title and survey review, with the cost and schedule risk that comes with each finding.
03
Power and utilities
Utility engagement, load studies, interconnection and substation strategy, and a realistic date for when power arrives.
04
Water and natural gas
Cooling water availability and rights, wastewater discharge, and fuel supply for on-site generation.
05
Fiber and connectivity
Carrier routes, path diversity and latency to the markets and cloud regions your tenants need to reach.
06
Development constraints and community
Entitlements, permitting, setbacks, noise and height limits, and a community engagement plan that earns local support.
Site selection, a large-load utility grid interconnect, a systems and facilities impact study, and mission-critical power and cooling infrastructure design.